United Parcel Service (UPS) is one of the leading multinational package delivery and supply chain management companies in the world. In July 2018 UPS opened the doors to its new Western Regional Hub near the Salt Lake International Airport. The $275 million project has generated more than 1,700 permanent jobs helping to stimulate growth and the local economy. The 160-acre site includes a truck maintenance facility, a truck wash building, a retail commerce building, a security port for trucks, as well as employee parking and an employee entrance building. This new facility is now one of the company’s largest national packaging centers, positioning Salt Lake to be a top distribution location in the United States.
Layton Construction Company involved Hunt Electric early in the project, deploying seven of eight in-house divisions to execute the project on budget and on schedule. During preconstruction and design, our in-house surveying team was utilized to capture and translate accurate underground as-builds into surveying equipment. This allowed the team to predetermine routes and more efficiently lay conduit during the underground phase, which was critical due to the aggressive project schedule. Looking for other creative ways to save time, Hunt Electric pre-installed all interior and exterior wall conduit prior to tilt-up, a new concept in this arena which drastically expedited the construction schedule and set the pace for other onsite teams. All pre-bent conduit kits used were produced and assembled by the in-house prefabrication department, allowing for quick installation and cost savings to the client.
Our High Voltage Division designed and installed a substation solution for the project that could be delivered within the aggressive project schedule. Hunt Electric identified a solution provided by Construction Innovations, a company that was able to provide a pre-kitted modular substation solution that minimized weeks of construction time. Due to the large power demand required to run the UPS facility, the project team designed and constructed a 138KV-12.47KV 20 Megawatt substation with (2) 10 MVA transformers to feed the (6) 4000 A interior distribution substations located inside the facility.
The Hunt Electric High Voltage Division is equipped to construct and maintain your utility systems. Services include:
- Sub-transmission & Transmission lines up to 345kV
- Overhead & Underground Distribution
- Transmission Line Construction
- Emergency Response to Power Outage
- Construction of Distribution
- Substation Construction up to 345kV
- Line Reconductoring & Relocations
- Emergency Service Restoration
- Structure Change-outs & Live-line Maintenance
- Tubular Steel & Lattice Tower Erection
- Engineering Services